Masterplan Costings

Here’s an overview of the key aspects covered in masterplan costings:

01

Project Scope and Objectives

We work closely with the project team to understand the masterplan’s scope, objectives, and desired outcomes. We analyse the project requirements, functional needs, and design considerations to develop a comprehensive understanding of the project’s goals.

02

Detailed Cost Estimation

We prepare detailed cost estimates for all elements of the masterplan, including buildings, infrastructure, landscaping, site works, utilities, and any other components specified in the plan. We consider factors such as materials, labour, equipment, specialized services, and construction methodologies to accurately estimate costs.

03

Quantification and Measurement

We quantify and measure in high level the quantities of materials, resources, and labour required for each component of the masterplan. This involves taking off quantities from the design drawings or models and applying industry-standard measurement techniques to determine the required amounts.

04

Cost Analysis and Benchmarking

We conduct cost analysis and benchmarking exercises to compare the estimated costs against industry standards, previous similar projects, or historical data. This helps in evaluating the reasonableness of the estimated costs and identifying any potential cost-saving opportunities.

05

Value Engineering and Cost Optimization

We collaborate with the project team to explore value engineering opportunities within the masterplan. We analyse the design, materials, and construction methods to identify potential cost optimizations without compromising on the quality or functionality of the project.

06

Risk Assessment and Contingency Planning

We assess the potential risks and uncertainties associated with the masterplan. We identify and quantify the potential cost implications of these risks and advise on the appropriate level of contingency to include in the cost estimates to mitigate potential cost overruns.

07

Cash Flow Projections

We prepare cash flow projections for the masterplan, considering the anticipated costs over the project’s duration. This helps stakeholders understand the financial requirements and plan for funding and resource allocation accordingly.

08

Cost Reporting and Documentation

We maintain accurate cost records and documentation throughout the masterplan development. We generate cost reports, including detailed breakdowns of costs by component, provide cost summaries, and ensure transparency in cost reporting to facilitate effective project management and financial control.